Founder

Levon Melikyan began his architectural career in the early 1970s
at the YerevanProekt Institute, where he worked for over twenty
years on civic, infrastructure, and urban projects at a scale
rarely encountered in private practice. The work documented here
spans that period, the years of the “ART” Architecture and
Planning Cooperative, his engagement with Diran & Masri in
Jordan, and his commission for the Armenian diplomatic compound in
Ashkhabad — a body of work produced across five decades and three
countries.

Many of the drawings shown are original plansheet photographs
from the Soviet period, assembled side by side as was customary
for presentation at the time. They are reproduced here as
documents of record.

Attribution in Soviet institutional practice did not always
reflect individual contribution. Where Levon participated as part
of the official design team without receiving authorship credit,
this is noted. Credits are given as documented in original
institute records, with Levon’s consistent preference to list his
collaborators — and in particular his mentor Stepan Kyurkchyan —
first.

Career span

50+

Years in practice,
late 1960s to present

Projects

300+

Across Armenia, Jordan,
Turkmenistan, and the USA

Recognition

– Biennale Mondiale de l’Architecture, Sofia, 1985

– 1st place, Armenian Village Housing Competition, 1986

– 1st place, Ramala Housing Competition, 1996

Institutions

– YerevanProekt Institute

– ”ART” Architecture and Planning Cooperative

– Diran & Masri, Amman

– FineGold Alexander, Boston

– Ministry of Foreign Affairs, RA

YerevanProekt Institute   Yerevan, Armenian SSR1969 – 1989

Original plansheet photograph · YerevanProekt Institute

1972 – 1973

Nor Nork Supermarket

Neighbourhood-scale retail building in the Nor Nork district, Yerevan.

Architect

Levon Melikyan

Institution

YerevanProekt Institute

Original plansheet photographs · YerevanProekt Institute

1975 – 1976

Abovyan Street Reconstruction & Underpasses

Urban reconstruction of Abovyan Street including pedestrian underpasses at the Abovyan–Tumanyan and Abovyan–Sayat-Nova junctions, Yerevan.

Architects

Levon Melikyan, Lia Kyurkchyan

Institution

YerevanProekt Institute

Original plansheet photograph · YerevanProekt Institute

1978

Central House of Services
Կենցաղի տուն

Mixed civic services building for Yerevan. Public amenity programme at city scale.

Architects

Stepan Kyurkchyan, Levon Melikyan

Institution

YerevanProekt Institute

Original plansheet photograph · YerevanProekt Institute

1979 – 1981

Underground Development
Opera Square – Tumanyan Street

The Opera Square–Northern Avenue Underground Link (passing beneath Tumanyan Street). The project was designed to solve the Opera and Ballet Theatre’s rehearsal hall shortage.

Architects

Stepan Kyurkchyan, Levon Melikyan

Institution

YerevanProekt Institute

Original plansheet photographs ·
YerevanProekt Institute

Original plansheet photographs ·
YerevanProekt Institute

1979 – 1981

Underground Development
Opera – Bagramyan / Lenin Junction

Underground pedestrian development at the junction of Lenin and Bagramyan avenues — now Mashtots and Sayat-Nova avenues. Part of the wider Opera Square urban infrastructure programme.

Architects

Stepan Kyurkchyan,
Levon Melikyan

Institution

YerevanProekt
Institute

Yeritasardakan metro station, Yerevan · Photograph c. early 1980s

1979 – 1981

Metro station “Yeritasardakan”

Architect:Stepan Kyurkchyan

Levon Melikyan was a member of the design team for Yeritasardakan metro station, Yerevan, during his tenure at YerevanProekt Institute — early 1980s. Authorship credits for this project have been widely misreported in secondary sources.

Original plansheet photographs · YerevanProekt Institute

1982 – 1984

Kanaker Garden

Public garden and landscape design for the Kanaker district, Yerevan.

Architects

Stepan Kyurkchyan, Levon Melikyan,
Lia Kyurkchyan, Alexander Badalyan

Institution

YerevanProekt
Institute

Three-sheet presentation
drawing, photographed assembled · YerevanProekt Institute

Late 1970s – Early 1980s

Algorithm Research Institute Compound

Full compound of the Scientific Research Institute “Algorithm” — НИИ «Алгоритм» — for the Ministry of Radio Industry of the USSR, Achapnyak district, Yerevan. Programme: laboratories, offices, computer centre, dormitory, dining facilities. Abelyan Street 6/12.

Architects

Stepan Kyurkchyan, Levon Melikyan, Khachatur Muradyan

Institution

YerevanProekt
Institute

Location

Abelyan Street
6/12, Achapnyak, Yerevan

Original plansheet photographs · YerevanProekt Institute

1985 – 1986

Standardised Housing for Armenian Villages

Competition entry for a standardised residential typology for Armenian villages. First place.

Architects

Stepan Kyurkchyan, Levon Melikyan

Institution

YerevanProekt Institute

Competition · First Place · 1986

Original plansheet photograph · YerevanProekt Institute

1986

Gosagroprom Building

Administrative building for the State Agro-Industrial Committee of the Armenian SSR, Yerevan.

Architects

Stepan Kyurkchyan, Levon Melikyan

Institution

YerevanProekt Institute

“ART” Architecture and Planning Cooperative   Armenian SSR / Republic of Armenia1988 – 1992

General plan combined with PAP · 1:2000 · Base plan and planning constraints · Original document scan

1988 – 1992

General Plan of Gugark

City-scale general plan for Gugark — Գուգարք — the district centre, at 1:2000. Produced during the cooperative period spanning the end of the Soviet era and Armenian independence.

Architect

Levon Melikyan

Cooperative

“ART” Architecture and Planning Cooperative

1988 – 1992

High School No. 2, Stepanavan

Secondary school in Stepanavan, designed and built in the immediate aftermath of the 1988 Spitak earthquake. Structural integrity and seismic resistance were the primary design obligations. Finish specification and the entrance portal were value-engineered out as Soviet supply chains collapsed. The building stands as designed structurally.

Architect

Levon Melikyan

Cooperative

“ART” Architecture and Planning Cooperative

Diran & Masri Consultants   Amman, Jordan1994 – 1996

1995

Shoman Center, Amman

Cultural and arts centre for the Abdul Hameed Shoman Foundation, Amman — gallery spaces, multipurpose hall, and public amenities. Part of a broader programme of civic and cultural commissions during Levon’s engagement with Diran & Masri, which also included the Arab Cultural Center in Amman, the Arab Cultural Center in Beit Hanina (Jerusalem), and reconstruction works for the Armenian Patriarchate in Jerusalem.

Architect

Levon Melikyan

Practice

Diran & Masri Consultants, Amman

Competition · First Place · Ramala Housing · 1996

Ministry of Foreign Affairs   Republic of Armenia1997 – 1998

1997 – 1998

Compound of the Diplomatic Mission of the Republic of Armenia, Ashkhabad

Full diplomatic compound in Ashkhabad (now Ashgabat), Turkmenistan. Programme: Embassy building, Business Centre, Cultural Centre, church, restaurant, and residential suite — a complete diplomatic precinct.

Architect

Levon Melikyan

Commission

Ministry of Foreign Affairs, Republic of Armenia